This report describes final prediction results by system analysis codes during the OECD/NEA ISP-50 exercise, targeting a 50% direct vessel injection (DVI) line break integral effect test performe...
The main objective of ISP-47 was to assess the capabilities of lumped parameter (LP) and computational fluid dynamics (CFD) codes in the area of containment thermal-hydraulics. Following the recommen...
Hosted by the French Institute for Radiological Protection and Nuclear Safety (IRSN) and the Nuclear Energy Agency (NEA)
Working under the mandate of the CSNI, the objective of the WGFCS i...
The workshop was hosted by the French Institute for Radiological Protection and Nuclear Safety (IRSN) and the Nuclear Energy Agency (NEA)
The Nuclear Energy Agency (NEA) Commit...
On 28-30 April 2014, the CSNI Working Group on Risk Assessment (WGRISK) held a workshop on Fire Probabilistic Risk Assessment (PRA) in Garching, Germany. The meeting was attended by nearly 60 partici...
The OECD Nuclear Energy Agency (NEA) Committee on the Safety of Nuclear Installations (CSNI) Working Group on Fuel Cycle Safety (WGFCS) held an international workshop on Operational and Regulatory As...
The Working Group on Fuel Cycle Safety (WGFCS) of the Nuclear Energy Agency (NEA) Committee on the Safety of Nuclear Installations (CSNI) held an international workshop on Process and Safety Improvem...
In response to the technical and scientific needs emerged recently in this area, the Working Group of External Events (WGEV) and the Working Group on Risk Assessment (WGRISK) initiated a joint task e...
The July 2006 Forsmark-1 event identified a number of design deficiencies related to electrical power supply to systems and components important to safety in nuclear power plants. The CSNI establishe...