RelevanceRel. | CCVM | SET Facility | Description |
---|---|---|---|
100% | 6.12 | Guide Tube (CCFL Test Facilitv) Toshiba [6.12] | Description |
100% | 11.44 | LS/GE Level Swell in Blowdown [11.44] | Description |
100% | 8.2 | MARVIKEN [8.2] | Description |
100% | 3.15 | OMEGA Rod Bundle [3.15] | Description |
100% | 3.14 | OMEGA Tube (Inside) [3.14] | Description |
100% | 6.11 | SHTF (Spray Heat Transfer Test Facility) Toshiba [6.11] | Description |
50% | 4.4 | BATTELLE BWR 150396 [4.4] | Description |
50% | 4.3 | BATTELLE PWR RS 16 [4.3] | Description |
50% | 4.2 | HDR Vessel [4.2] | Description |
50% | 11.28 | HST, SSTF, VSF/GE Spray Tests [11.28] | Description |
50% | 5.17 | PIPER (Blowdown), PISA [5.17] | Description |
50% | 3.6 | TAPIOCA (Vertical) [3.6] | Description |
50% | 4.1 | UPTF [4.1] | Description |
No CFD facilities