100% |
10.1 |
ACHILLES Reflood Loop [10.1] |
Description |
100% |
7.1 |
BCN Boiloff/Reflood Tests (36 rods) [7.1] |
Description |
100% |
3.13 |
ERSEC Rod Bundle [3.13] |
Description |
100% |
6.8 |
ESTA (Eighteen Degree Sector Test Apparatus) Toshiba [6.8] |
Description |
100% |
6.9 |
ESTA-KP (KWU/PWR) Toshiba [6.9] |
Description |
100% |
11.23 |
FLECHT SEASET Westinghouse [11.23] |
Description |
100% |
5.6 |
Gen 3x3 (Steam Generator), SIET [5.6] |
Description |
100% |
9.1 |
NEPTUN-I Boiloff [9.1] |
Description |
100% |
9.2 |
NEPTUN-I and NEPTUN-II Reflood [9.2] |
Description |
100% |
3.15 |
OMEGA Rod Bundle [3.15] |
Description |
100% |
3.10 |
PATRICIA GV 1 [3.10] |
Description |
100% |
3.9 |
PERICLES Cylindrical [3.9] |
Description |
100% |
3.8 |
PERICLES Rectangular [3.8] |
Description |
100% |
3.19 |
PIERO (Air/Water) [3.19] |
Description |
100% |
2.2 |
REWET-II [2.2] |
Description |
100% |
6.14 |
SCTF, JAERI [6.14] |
Description |
100% |
6.5 |
SG U-Tube Test Facilitv JAERl [6.5] |
Description |
100% |
8.5 |
SlV [8.5] |
Description |
100% |
10.2 |
THETIS Bundle [10.2] |
Description |
100% |
11.38 |
THTF/ORNL [11.38] |
Description |
100% |
6.1 |
TPTF, JAERI [6.1] |
Description |
100% |
4.12 |
Thermalhyd. UP-BBR RS 373 [4.12] |
Description |
100% |
11.51 |
UCB CCFL [11.51] |
Description |
100% |
4.1 |
UPTF [4.1] |
Description |
50% |
5.7 |
8x8 Bundle, CISE [5.7] |
Description |
50% |
10.16 |
Crossflow Two-Phase Wind Tunnel [10.16] |
Description |
50% |
3.7 |
DADINE (Vertical Tube, Inside) [3.7] |
Description |
50% |
11.44 |
LS/GE Level Swell in Blowdown [11.44] |
Description |
50% |
10.32 |
Low Pressure Boiling Fac. (Harwell) [10.32] |
Description |
50% |
11.52 |
MB-2 SG Transient/Westinghouse [11.52] |
Description |
50% |
6.7 |
SRTF (Reflood), Toshiba [6.7] |
Description |
50% |
6.6 |
Single Pin Heat Transf.TF, JAERI [6.6] |
Description |
50% |
11.17 |
TUBE + CHANNEL DART Air/Water [11.17] |
Description |